+5 votes
by (3.6k points)

The time it takes to install a kitchen with stock cabinets can vary depending on several factors, including the size and complexity of the kitchen, the experience of the installers, and any additional modifications or customizations required. However, in general, installing a kitchen with stock cabinets is typically quicker compared to custom-made or semi-custom cabinets because the stock cabinets are pre-made and readily available.

On average, the installation of stock cabinets in a standard-sized kitchen can take anywhere from 1 to 5 days. Here's a rough breakdown of the installation process:

  1. Preparation and planning: Before installation begins, the installer will measure the kitchen space, verify the layout, and check that all the necessary materials and tools are on hand. This preparation stage may take a few hours.

  2. Demolition and removal: If there are existing cabinets that need to be removed, this process may take a few hours to dismantle and clear the space.

  3. Cabinet assembly: Stock cabinets usually come pre-assembled or in flat-pack form, so assembling them might take a few hours or less, depending on the number of cabinets.

  4. Mounting the cabinets: Mounting the cabinets on the walls can take a significant amount of time, especially if there are many cabinets to install or if modifications to the walls are necessary.

  5. Leveling and adjusting: Ensuring that all the cabinets are level and properly aligned is crucial for a good installation. This step may take some time, especially if the walls are not perfectly straight.

  6. Installing hardware: Installing handles, knobs, and other hardware on the cabinets is generally a quick process but can add some time to the overall installation.

  7. Countertop installation: While not part of the cabinet installation itself, installing the countertops typically follows the cabinet installation. Depending on the type of countertops and the complexity of the design, this step may take another day or more.

  8. Final touches and clean-up: After the cabinets and countertops are in place, any remaining adjustments, touch-ups, and clean-up will be done to complete the installation.

Keep in mind that unexpected challenges or customizations requested by the homeowner could extend the installation time. To get a more accurate estimate, it's best to consult with a professional kitchen installer who can assess your specific kitchen layout and provide a more detailed timeframe based on their experience and the scope of the project.