The time it takes to install a kitchen with stock cabinets can vary depending on several factors, including the size of the kitchen, the complexity of the design, the experience level of the installer, and any additional modifications or adjustments needed. However, as a rough estimate, here's a general timeline for installing a kitchen with stock cabinets:

  1. Delivery and preparation: Once the stock cabinets are purchased and delivered, it's essential to inspect them for any damage and ensure that all the necessary components and hardware are included. This step might take a day or two, depending on the availability of the cabinets and your preparation process.

  2. Demolition and removal: If you're replacing existing cabinets, the removal process can take anywhere from a few hours to a day, depending on the size and complexity of the existing kitchen.

  3. Cabinet placement and leveling: Setting the base cabinets in place and ensuring they are level is crucial for a proper installation. This step might take a day, depending on the number of cabinets and any adjustments needed to level them.

  4. Wall cabinet installation: Installing the wall cabinets typically takes a day or two, depending on the complexity and number of cabinets to be hung on the walls.

  5. Countertop installation: After the cabinets are in place, the countertops can be measured, fabricated, and installed. Depending on the material chosen and availability, this step might take a few days to a week.

  6. Plumbing and electrical work: Connecting sinks, faucets, appliances, and lighting fixtures could take an additional day or more, depending on the complexity of the kitchen's layout.

  7. Finishing touches: Adding trim, moldings, and any final adjustments can take another day to complete.

Overall, for a standard-sized kitchen with stock cabinets, the installation process might take around 1 to 2 weeks, considering the various steps involved. Keep in mind that unexpected issues or delays can arise during the installation, so it's essential to be flexible with the timeline. If you're hiring a professional contractor or a kitchen installation service, they will be able to provide you with a more accurate estimate based on your specific project details.